Electrical & Safety
Built-in protection
-
Anti-islanding
-
DC disconnect on the inverter
-
AC disconnect at the meter
-
Exterior disconnect
National Electrical Code (NEC) labels
-
Required on all hardware
-
Required on all pipes
Wiring & Inspection
-
New National Electrical Manufacturer Association (NEMA) rated electrical boxes are installed at each site.
-
All wiring is installed by a licensed Master Electrician provided by SOLAR FX.
-
Upon installation and wiring completion, each site must undergo an electrical inspection through the State of Iowa. The customers' utility company must receive the signed Certificate of Completion and State Electrical Inspection report before SOLAR FX is permitted to turn on the PV array.