Solar FX

how long does it take to build a project once it goes to contract?

This depends greatly on which utility we are working with and the size of the array. Another aspect that factors into the time it takes to build is cooperation from the Owner. For example, SOLAR FX will need signatures from the Owner on documents for the Utility company and the city. Delaying in signatures and payments can delay the project. However, generally speaking, a project could take anywhere from 3 – 6 months. 

« Back

© 2025 Solar FX. All rights reserved.